首页> 外文会议>Annual International Water Conference >Lay-Up and Return to Service Practices at Ontario Power Generation
【24h】

Lay-Up and Return to Service Practices at Ontario Power Generation

机译:在安大略省发电中铺设并返回服务实践

获取原文

摘要

Ontario Power Generation (formerly Ontario Hydro) is a provincially owned Canadian Utility that has provided better than 80% of the Province’s electricity for the past 100 years. OPG’s current mix of assets includes several peaking fossil fuel plants (primarily coal fired drum units). This paper reviews the current practices for short and medium term lay-up of these peaking units. It includes the key return to service parameters and practices used at OPG, and reviews the relative performance of the units following these practices. The paper focuses on the water chemistry aspects of the lay-up and return to service. In particular, chemical parameter monitoring and chemical dosing practices in addition to the use of chemical control equipment such as condensate polishers. The paper focuses on two-shifting, weekend outage turnarounds, and planned maintenance outage turnarounds, but it also covers indefinite length non-maintenance outages which can last up to several months
机译:安大略省发电(以前安大略省Hydro)是一家省拥有的加拿大效用,在过去100年中提供了该省省电力的80%。 OPG目前的资产组合包括几种峰化化石燃料厂(主要是燃煤鼓单位)。本文审查了这些峰值单位的短期和中期铺设的现行实践。它包括在OPG中使用的服务参数和实践的关键返回,并审查这些实践后的单元的相对性能。本文重点介绍了铺设的水化学方面并返回服务。特别是化学参数监测和化学给药除了使用化学对照设备,如冷凝水抛光剂。本文重点介绍两轮,周末停电转机,并计划维护停电转机,但它也涵盖了无限的长度非维护中断,可以持续数月

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号