首页> 外文会议>International Offshore and Polar Engineering Conference >Improvement of Plastic Board Drain Method Applied at the Pusan New Port Project Site in Korea
【24h】

Improvement of Plastic Board Drain Method Applied at the Pusan New Port Project Site in Korea

机译:在韩国庞山新港口项目现场应用塑料板排水法的改进

获取原文

摘要

This paper presents the improvement of Plastic Board Drain method on deltaic marine clay at Pusan's New Port Project site in Korea. A total of 32,088,326m Plastic Board Drain (PBD) with lengths of 40~50m was constructed for improvement of soft marine clay. Clarifying the ground improvement effect, several types of field monitoring instruments and site investigation including CPT test for deep depth penetration were performed. Around 3.5~5.0m consolidation settlement occurred and it is estimated that thick soft clay was successfully improved based on monitoring and investigation results.
机译:本文介绍了韩国普森新港口项目现场的塑料板排水法的改善。为改善软海洋粘土,共有32,088,326M的塑料板排水管(PBD)为40〜50米。澄清地面改善效果,进行了几种类型的现场监测仪器和包括CPT测试对深度深度渗透的现场调查。发生大约3.5〜5.0米的整合结算,估计基于监测和调查结果成功改善了厚软粘土。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号