首页> 外文会议>World Energy Engineering Congress >GM'S ENERGY SAVINGS PROJECT PROCESS: HOW TO GET MONEY FOR ENERGY PROJECTS
【24h】

GM'S ENERGY SAVINGS PROJECT PROCESS: HOW TO GET MONEY FOR ENERGY PROJECTS

机译:通用汽车的节能项目流程:如何为能源项目获得金钱

获取原文

摘要

Energy use is a large, but mandatory, expense incurred by manufacturers or facility operators and contributes to Greenhouse Gas (GHG) emissions. At General Motors (GM), although our expenditure for energy is not a large percentage of our total cost, we do spend in excess of $1 Billion USD annually. GHG emissions from energy use represent over 8 million metric tons per year of GM's carbon footprint, equivalent to the energy use for 730,000 homes. Hence, a robust process is needed for Energy Conservation Measures (ECM). Management of energy and carbon to reduce environmental impact has become important enough to be included in our business plan, similar to safety, people, quality, responsiveness, and cost. Following a model similar to EPA Energy Star's seven step approach, energy as an environmental element has been integrated into GM's business policy and model. Based on top level commitment and public goals to reduce energy and GHG by 20% from 2010 to 2020, GM uses its standardized Global Manufacturing System (GMS) to ensure that energy efficiency and conservation is properly managed through performance assessment, action plans, evaluating progress, and recognizing achievements. As conservation methods are part of our operating plan, energy savings projects become a key enabler for continuous improvement in energy and carbon reduction. Since energy projects compete with other spending, successful methods to secure funding is required. Beginning with the "Why" for annual funding of projects, having a strategic plan, managing the process with lots of data, and communicating the results are needed to ensure adequate funding for energy savings projects. Selling the need and benefit is critical gain ongoing support. Integrating energy project implementation into your business plan helps to sustain it for long term success.
机译:能源使用是制造商或设施运营商产生的大型但强制性的费用,并有助于温室气体(GHG)排放。在通用汽车(GM),虽然我们的能源支出并不是我们总成本的大百分比,但我们每年的时间超过10亿美元。从能源使用的温室气体排放量超过了每年有超过800万吨的通用碳足迹,相当于730,000家的能源使用。因此,节能措施(ECM)需要强大的过程。能源和碳管理以减少环境影响已经变得足够重要,以便包含在我们的业务计划中,类似于安全,人,质量,响应性和成本。遵循类似EPA能源之星的七步方法的模型,作为环境元素的能量已被纳入通用汽车的业务政策和模型。基于最高级别的承诺和公共目标,将能源和GMG从2010年降低到2020%,GM使用其标准化的全球制造系统(GMS),以确保通过绩效评估,行动计划,评估进度妥善管理能源效率和保护,并认识到成就。随着保护方法的一部分是我们的操作计划,节能项目成为能源和碳减少持续改善的关键推动者。由于能源项目与其他支出竞争,因此需要成功的方法来保护资金。从“为什么”项目的“为什么”,具有战略计划,管理有很多数据的过程,需要传达结果,以确保为节能项目提供足够的资金。销售需求和福利是关键增益持续支持。将能源项目实施整合到您的商业计划中有助于维持它以实现长期成功。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号