首页> 外文会议>Turbomachinery Symposium >REDESIGN OF THE LAST TWO STAGES OF A MECHANICAL DRIVE STEAM TURBINE
【24h】

REDESIGN OF THE LAST TWO STAGES OF A MECHANICAL DRIVE STEAM TURBINE

机译:重新设计机械驱动汽轮机的最后两个阶段

获取原文

摘要

A six stage mechanical drive steam turbine rated at 13,300 hp was installed at a petroleum facility in Texas to drive a multistage centrifugal compressor used in recycle gas service on a high pressure hydrogen cracker. Since its installation, there has been a failure of either the fifth or sixth stage blades at intervals of 18 months to two years. The blades failed due to high cycle fatigue initiating in the dovetail root attachment. To alleviate this problem, wider, more robust blades with improved aerodynamics were designed, which include Z-shrouds and a new root dovetail attachment with a lower stress concentration.
机译:在德克萨斯州的石油设施上安装了六级机械驱动蒸汽轮机,以13,300 HP安装在德克罗斯的石油设施中,以驱动在高压氢气裂解器上的再循环气体服务中使用的多级离心式压缩机。自安装以来,第五个或第六阶段叶片的间隔为18个月至两年。由于在燕尾根附着的高循环疲劳引起,刀片失效。为了缓解这一问题,设计了更广泛,更强大的刀片,具有改进的空气动力学,包括Z-Shrouds和具有较低应力浓度的新根燕尾榫附件。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号