How much trouble can narrow vertical fissures in bedrock cause on a shallow bedrock site? Enough trouble so end-bearing H-piles range between 8 and 100 feet long in a single pile cap and tiebacks range from 40 to over 100 feet long within a 10 foot wall span. Sloped bedrock surfaces also complicated the tieback installation as the drill casing followed the sloped rock surface while drilling and caused unanticipated bending (and sometimes breaking) of the drill string. Warned via pre-construction rock probes and cores reaching over 80 feet deep at the Winooski, Vermont project site, the design and construction team expected anomalies in pile driving and tieback drilling due to fissures in the bedrock filled with soil and weathered-rock. The degree of abruptness in the variability in the rock surface, and its impact on pile driving and tieback drilling were less predictable. Close monitoring of pile and tieback installation, redesign of pile caps, and lengthened tiebacks overcame these anomalous fissures. This paper shares the lessons learned for overcoming these geologic challenges to benefit designers, contractors bidding the work, and ultimately, the owner, with lower contingencies.
机译:多大的麻烦可以在浅根底部位缩小事业基岩裂隙垂直?够麻烦所以端轴承H-桩范围长尺8和100之间在单个桩帽和锚碇的范围从40到100英尺长的10英尺壁跨度内。作为钻头套管随后倾斜岩石表面随钻和未预料到的引起钻柱的弯曲(有时断裂)倾斜基岩表面也变得复杂的回接安装。通过施工前的岩石探针和核心达到80英尺深的威努斯基,佛蒙特州项目现场警告,设计和施工队伍有望在打桩和回接钻井由于裂缝异常在装满土的基岩风化岩石。唐突的在岩石表面的变化程度,及其对打桩影响和回接钻井是难以预料。密切监测桩锚碇安装,重新设计桩承台,加长锚碇克服了这些反常的裂缝。本文股学会了克服这些地质挑战,设计师,承包商的招标工作中获益的教训,最终,业主,以较低的突发事件。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号