首页> 外文会议>Power Systems Conference, 2006. MEPCON 2006 >Experience with internal competition using the single buyer model in Jawa Bali - Indonesia
【24h】

Experience with internal competition using the single buyer model in Jawa Bali - Indonesia

机译:使用印度尼西亚巴厘岛Jawa的单一买家模式进行内部竞争的经验

获取原文

摘要

The world-wide restructuring of utilities made the Indonesian government to enact a new electricity law to prepare the staging of electricity restructuring in Indonesia. This law came into force in September 2002, as law no. 20/2002. But in December 2004, the law was annulled by the Constitutional Court, and the government went back to the previous law, which was the Law No. 15/1985. Instead of moving backwards to the 1985 power system production code, PLN decided to further develop the Single Buyer Model for the generation, transmission and distribution units owned by PLN. The single buyer model was stipulated in the Law No. 20/2002, and is not in conflict with law no. 15/1985. This paper desfribes the rule of the internal Single Buyer Model, and discusses the lessons learned from applying this model.
机译:公用事业的全球重组使印度尼西亚政府制定了新的电力法,以准备在印度尼西亚进行电力重组。该法律于2002年9月生效,成为第1号法律。 20/2002。但是在2004年12月,该法律被宪法法院废除了,政府又恢复了以前的法律,即第15/1985号法律。 PLN并没有回溯到1985年的电力系统生产法规,而是决定进一步开发PLN拥有的发电,输电和配电单元的单一购买者模型。第20/2002号法律规定了单一购买者模式,并且与第1号法律没有冲突。 15/1985。本文描述了内部单一购买者模型的规则,并讨论了从应用此模型中学到的经验教训。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号