首页> 外文会议>Chinese International Dredging Technical Development Congress and Exhibition >Initiative and Innovations Facilitate the Execution of the Phase-II Dredging Works at the Yangtze Estuary
【24h】

Initiative and Innovations Facilitate the Execution of the Phase-II Dredging Works at the Yangtze Estuary

机译:主动和创新促进了长江口二期疏ed工程的开展

获取原文
获取外文期刊封面目录资料

摘要

Taking account of the quantities of bed material to be dredged, natural conditions,commercial shipping and other factors in the execution of the Phase-II dredging works at the Yangtze Estuary, some great breakthroughs have been made in plant and equipment and technical management by means of initiative and innovations so as to ensure the smooth completion of the works on schedule and with high quality.
机译:在进行长江口二期疏dr工程时,考虑到疏of的床料数量,自然条件,商业运输等因素,在厂房,设备,技术管理等方面取得了重大突破。主动性和创新性,以确保按时高质量地完成工程。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号