IMPLEMENT AND ENGINEERING MANAGEMENT OF THE CHANNEL DREDGING ENGINEERING IN THE SECOND PHASED YANGTZE ESTUARY DEEPWATER CHANNEL CONSTRUCTION PROJECT

机译:第二阶段长江口深水航道工程航道疏RED工程的实施与工程管理

获取原文

摘要

The capital construction of the second phased Yangtze estuary deepwater channel dredging engineering commenced in Jan, 2004, the total length of the channel reach 74.471km, bottom breadth 350~400 m, the designed depth is 10.0m under chart datum. After 15 months capital dredging, till March 29, 2005, the average channel depth reached 10.68m. Comparing the first phased channel construction, the second phased channel has the character of twice times dredging amount, tightly construction period, highly pressure on environmental protection and channel safety operation. Aim at above character, basing on the summarized experience for the successfully implement of the first phased channel construction and uninterrupted river pattern variety monitor & analysis, we achieved success on engineering commenced time choice, the settlement for stages water depth object, dredging safety management for one operation busy channel and environmental protection etc. On June 16 in 2005, the 10.0m depth channel was announced trial operation and announced formally operation on November 21 in 2005. The second phased channel has obtained good socioeconomic performance. Basing on the successful completion of the second phased project, we are accelerated propelling the project that extending Yangtze Estuary deep water channel to upper stream. Firstly synchronously opening 10.5m depth channel to Nanking, this project has been finished and announced formally operation on November 21 in 2005. The third stage project that will deepen Yangtze Estuary deepwater channel to 12.5m in three years construction period will be carried into execution in 2006.
机译:长江口深水航道第二期疏dr工程于2004年1月开始基本建设,航道总长度达到74.471km,底宽350〜400 m,设计水深在图基准下为10.0m。经过15个月的资金疏ed,直到2005年3月29日,平均航道深度达到了10.68m。与第一期相比较,第二期相具有疏amount量两倍,施工周期紧凑,环保压力大,通道安全运行的特点。针对以上特点,在总结成功实施第一期河道建设和不间断河型变化监测与分析的经验的基础上,成功实现了工程开始时间的选择,阶段水深目标的沉降,疏for的安全管理。 2005年6月16日,深度为10.0m的航道宣布试运营,并于2005年11月21日正式投入运营。第二阶段航道取得了良好的社会经济效益。在第二阶段工程成功完成的基础上,我们正在加快推进将长江口深水通道扩展到上游的工程。该项目首先同步开放至南京的10.5m深水道,已于2005年11月21日竣工并宣布正式运营。将在三年建设期内将长江口深水道加深至12.5m的三期工程将于2007年实施。 2006年。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号