首页> 外文会议>Proceedings of International Conference on Structural Mechanics in Reactor Technology >INTEGRATED PLANT LIFE MANAGEMENT(PLIM) – THE IAEACONTRIBUTION
【24h】

INTEGRATED PLANT LIFE MANAGEMENT(PLIM) – THE IAEACONTRIBUTION

机译:综合植物生活管理(PLIM)–国际原子能机构

获取原文
获取外文期刊封面目录资料

摘要

For the past couple of decades there has been a change of emphasis in the world nuclear powerfrom that of building new Nuclear Power Plants (NPP) to that of taking measures to optimize the lifecycle of operational plants. National approaches in many countries showed an increase of interest inPlant Life Management (PLiM), both in terms of plant service life assurance and in optimizing theservice or operational life of NPP. A strong convergence of views is emerging from different Nationalapproaches, particularly in the area of the economic aspects of NPP operation and in the evolution inthe scope of NPP PLIM.The latter can directly affect the cost of electricity from NPP in an increasingly competitiveenvironment. The safety considerations of a NPP are paramount and those requirements have to bemet to obtain and to extend/renew the operating license. To achieve the goal of the long term safe,economic and reliable operation of the plant an integrated Plant Life Management Programme (PLiM)is necessary. Some countries already have advanced PLiM Programmes while others still have none.The PLiM objective is to identify all that factors and requirements for the overall plant life cycle. Theoptimization of these requirements would allow for the minimum period of the investment return andmaximum of the revenue from the sell of the produced electricity.Recognizing the importance of this issue and in response to the requests of the Member States theIAEA Division of Nuclear Power implements the Sub-programme on "Engineering and ManagementSupport for Competitive Nuclear Power". Four projects within this sub-programme deal with differentaspects of the NPP life cycle management with the aim to increase the capabilities of interestedMember States in implementing and maintenance of the competitive and sustainable nuclear power.Although all four projects contain certain issues of PLiM there is one specific project on guidanceon engineering and management practices for optimization of NPP service life includingdecommissioning. This particular project deals with different specific issues of NPP life managementincluding aspects of ageing phenomena and their monitoring, issues of control and instrumentation,maintenance and operation issues, economic evaluation of NPP life cycle management includingguidance on its earlier shut down and decommissioning.
机译:在过去的几十年中,世界核电的重点已经发生变化 从建设新的核电站到采取措施优化寿命 运营工厂的周期。许多国家的国家方法显示出对以下方面的兴趣增加 工厂寿命管理(PLiM),既包括工厂使用寿命保证,也包括优化工厂寿命管理。 核电厂的服务或使用寿命。来自不同国家的意见正在形成强烈的共识。 的方法,特别是在核电厂运行的经济方面以及 NPP PLIM的范围。 后者可以在竞争日益激烈的情况下直接影响NPP的电力成本 环境。核电厂的安全考虑是至关重要的,必须满足这些要求。 会获得和延长/续签营业执照。为了实现长期安全的目标, 经济而可靠的工厂运营-完整的工厂寿命管理计划(PLiM) 是必要的。一些国家已经拥有高级PLiM计划,而其他国家则没有。 PLiM的目标是确定整个工厂生命周期的所有因素和要求。这 这些要求的最优化将允许最短的投资回报期和 出售发电产生的最大收益。 认识到这一问题的重要性,并应会员国的要求, 原子能机构核动力司执行关于“工程和管理”的次级方案。 对竞争性核电的支持”。本次级方案中的四个项目涉及不同领域。 NPP生命周期管理的各个方面,旨在提高相关人员的能力 成员国在实施和维持竞争性和可持续性核电方面的工作。 尽管所有四个项目都包含某些PLiM问题,但是有一个关于指导的特定项目 优化NPP使用寿命的工程和管理实践,包括 退役。这个特定的项目涉及NPP生命管理的不同特定问题 包括衰老现象及其监控,控制和仪表问题等方面, 维护和运营问题,核电厂全寿命周期管理的经济评估,包括 有关其更早关闭和退役的指南。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号