The following paper will discuss the challenges of the X-37: ALTV (Approach Landing TestVehicle) Structural Proofload Test. The challenges discussed will be in the following areas:Analysis, Test Build-up, and in Conducting the Test.The main objective of the X-37 ALTV Structural Proofload Test was to verify the structuralintegrity of the X-37 primary structure at proof load levels (1.2 X DLL). This was accomplishedby verifying the applied loads, measured reaction loads, and strain and deflection gaugemonitoring of key structures to pretest predictions. The unique test setup and all compositeprimary structure of the X-37, with both bonded and bolted joints, created a unique situation forverifying both the measured reaction loads and strain gauge measurements against pretestpredictions. The analysis portion of this paper will address the challenges and solutions faced bythe analysts during and after the structural proofload test.The test build-up incorporated some new and innovated techniques to solve inherent difficultiesassociated with this test vehicle. The test fixture incorporated for this test was used before tosimulate the Space Shuttle Cargo Bay, which tested the Space Station Truss Segments (S1 andS0). In addition to this test fixture, a separate beam structure was designed to interface with theB-52 Canopy on the X-37 vehicle. The benefit of this structure was two fold. One, it was usedto transport the test vehicle in and out of the Space Shuttle Cargo Bay simulated fixture. Two, isthe main reaction structure for the test vehicle under structure loads. In this paper, the authorwill discuss the advantages and disadvantages of using this fixture.Conducting the X-37: ALTV Structural Proofload Test was a challenge. The program scheduleand budget left no room for error. The test team was under excruciating pressure to meet all theobjectives of the test, on schedule and on budget. The authors of this paper will discuss howthey meet all the objectives, for a successful structural test.
机译:以下文章将讨论X-37的挑战:ALTV(进近着陆测试) 车辆)结构载荷试验。讨论的挑战将在以下方面: 分析,测试建立以及进行测试。 X-37 ALTV结构过载试验的主要目的是验证结构 X-37主结构在标准载荷水平(1.2 X DLL)下的完整性。完成了 通过验证施加的载荷,测得的反作用载荷以及应变和挠度规 监视关键结构以预先测试预测。独特的测试设置和所有组合 X-37的主要结构,包括粘合和螺栓连接,为以下方面创造了独特的条件: 根据预测试验证测得的反应载荷和应变仪测量值 预测。本文的分析部分将解决面临的挑战和解决方案 在结构试验载荷测试期间和之后的分析人员。 测试集结合了一些新的和创新的技术来解决固有的困难 与此测试车辆相关联。在进行以下测试之前,使用了用于此测试的测试夹具: 模拟航天飞机货运湾,测试了空间站桁架段(S1和 S0)。除了该测试夹具外,还设计了一个单独的梁结构来与 X-37车辆上的B-52机盖。这种结构的好处是两个方面。一,它被用来 以便将测试车辆运入和运出航天飞机货运湾模拟固定装置。二是 试验车辆在结构载荷下的主要反应结构。在本文中,作者 将讨论使用此灯具的优缺点。 进行X-37:ALTV结构载荷试验是一个挑战。计划时间表 和预算没有错误的余地。测试小组承受着巨大的压力,无法满足所有 测试的目标,按计划和按预算进行。本文的作者将讨论如何 它们满足了所有目标,从而成功进行了结构测试。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号