首页> 外文会议>SPE Asia Pacific oil gas conference and exhibition >Integrated Management of Water, Lean Gas, and Air Injection: The SuccessfulIngredients to EOR Projects on the Mature Handil Field
【24h】

Integrated Management of Water, Lean Gas, and Air Injection: The SuccessfulIngredients to EOR Projects on the Mature Handil Field

机译:水,贫气和注气的综合管理:成熟汉迪尔油田EOR项目的成功要素

获取原文

摘要

The future of large very mature oilfields relies upon thesuccessful application of EOR techniques. This paperdiscusses from the Handil field case, the more useful conceptand practices that are applicable to optimize oil recovery in amulti-layer, multi reservoir waterflooded field.The Handil field, discovered in 1974, is a giant matureoilfield located in the Mahakam Delta, Indonesia. The fieldwas developed using conventional oil recovery methods:natural depletion and peripheral water injection and produceda maximum of 200,000 BOPD in the late seventies. Currently,the oil recovery is around 50% with a 15,000 BOPDproduction at high watercut.The Handil EOR lean gas injection project was started inNovember 1995 on five reservoirs and following its positiveresult was extended with six reservoirs in 2000. In 2003, anintegrated study on the largest EOR reservoir was performedto assess the projects’ performance. This included 3Dgeomodeling, reservoir simulation and chemical tracerinjection. The study permitted to track the main effects of thegas injection, to identify “bypassed oil” areas and to definereservoir management guidelines for the other lean gasinjection reservoirs.As field scale application of the gas injection technique isnot sustainable since the gas is exportable, two othertechniques are currently being evaluated as an alternative.Second Contact Water Displacement (SCWD) is plannedto be introduced on the maturest lean gas injection reservoirs.Simulation studies forecast potential for this technique whichalso allows decreasing the volumes of injected gas.An Air injection pilot on a waterflooded reservoir wasstarted in 2001. First results are encouraging but the injectionwas temporary suspended due to injector well problems after 6months of injection. The project was comprehensively studiedby compositional and thermal simulation and intends to restartearly 2005.Integrated studies of the Handil reservoirs provided indepthunderstanding of EOR mechanisms. This resulted in theability to better model field performance and to forecasttertiary oil production more accurately.
机译:大型非常成熟的油田的未来取决于 EOR技术的成功应用。这篇报告 从汉迪尔案中讨论,更有用的概念 适用于优化石油采收率的方法和实践 多层,多储层注水油田。 1974年发现的Handil油田是一个非常成熟的 油田位于印度尼西亚马哈卡姆三角洲。场 是使用常规采油方法开发的: 自然消耗和外围注水并产生 在七十年代后期,最大为200,000 BOPD。目前, 15,000 BOPD的石油采收率约为50% 高含水量的生产。 汉迪尔EOR贫气注气项目于2004年启动 1995年11月,建立了五个水库,并对其积极影响 结果在2000年扩展到六个水库。2003年, 对最大的EOR油藏进行了综合研究 评估项目的绩效。这包括3D 地质建模,油藏模拟和化学示踪剂 注射。该研究允许追踪药物的主要作用 注气,以识别“绕过的油”区域并定义 其他贫气的储层管理指南 注入储层。 由于气体注入技术在现场规模上的应用 由于天然气可出口,因此不可持续,另外两个 技术正在作为替代方案进行评估。 计划进行二次接触水置换(SCWD) 将引入最成熟的贫气注入气藏。 仿真研究预测了该技术的潜力, 还可以减少注入气体的量。 一个注水储层上的空气注入飞行员是 从2001年开始。最初的结果令人鼓舞,但注入 由于喷油器井问题而被临时暂停6 注射数月。对项目进行了全面研究 通过成分和热模拟,并打算重新启动 2005年初。 对汉迪尔油藏的综合研究提供了深入的信息 对采收率机制的理解。这导致了 能够更好地模拟现场性能并进行预测的能力 第三产油更准确。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号