首页> 外文会议>SPE/IADC drilling conference >U-Tube Wells – Connecting Horizontal Wells End to EndCase Study: Installation and Well Construction of the World’s First U-Tube Well
【24h】

U-Tube Wells – Connecting Horizontal Wells End to EndCase Study: Installation and Well Construction of the World’s First U-Tube Well

机译:U型管井–端到端水平井的连接案例研究:世界上第一个U型管井的安装和建造

获取原文

摘要

Although wellbores have been intersected before — boththrough planned intersections for the purpose of well controland through unplanned wellbore collisions — they have notbeen intersected for the purpose of actually joining theirwellpaths to effectively create one smooth continuous conduitfrom one surface location to another. There is just oneexception: the very large conduit between England andFrance! The purpose of this paper is to review the planningand execution of what is believed to be the world’s firstplanned successful joining of two such horizontal wells, with aslotted liner to casing connection in between them.
机译:尽管井筒之前已经相交了,但都 通过计划的交叉路口进行井控 以及意外的井眼碰撞-他们没有 为了真正加入他们的目的而被相交 有效创建一条平滑连续导管的井道 从一个表面位置到另一个表面位置。只有一个 例外:英格兰与 法国!本文的目的是审查计划 并执行被认为是世界上第一个 计划成功连接两个这样的水平井, 开槽的衬管与它们之间的套管连接。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号