SOUND TRANSIT LINK LIGHT RAIL NORTHERN EXTENSION

机译:声音转换连结轻轨北延线

获取原文

摘要

With construction underway on the 22.5 km (14 mile) Initial Segment of the Link Light Rail transit system in Seattle (including the one-mile EPB-driven running tunnels and mined station at Beacon Hill), the Sound Transit Board on May 20, 2004 voted on selection of a preferred route for an approximately eight-mile extension northwards from the central business district to Northgate, and authorized immediate start of advanced conceptual/preliminary engineering and geotechnical exploration programs scheduled to be completed in Spring 2005. The extension includes approximately 914 m (30,000) route-feet of bored running tunnels, a mined station with platform level approximately 60 m (200 ft) below grade, three (possibly four) cut-and-cover stations and a cut-and-cover cross-over structure, as well as an aerial terminal station at Northgate and other line-section below-grade and aerial structures. All tunneling will be in glacial soils.
机译:随着西雅图22.5公里(14英里)Link Light轻轨运输系统的初始部分(包括一英里的EPB驱动的正在运行的隧道和笔架山的矿山站)的施工正在进行中,Sound Transit Board将于2004年5月20日开始对从中央商务区向北门向北延伸约八英里的首选路线的选择进行投票,并授权立即启动计划在2005年春季完成的高级概念/初步工程和岩土勘探计划。该延伸包括约914条m(30,000)条无聊的运行隧道的路线英尺,一个平台高度低于坡度约60 m(200 ft)的矿山站,三个(可能是四个)切入覆盖站和一个切入覆盖交叉结构,以及Northgate的空中终点站以及其他低于地面的线段和空中结构。所有的开挖都将在冰川土壤中进行。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号