KING COUNTY'S PROJECT DELIVERY APPROACH FOR THE BRIGHTWATER PROJECT

机译:金县项目的污水处理项目

获取原文

摘要

Project delivery on major capital projects can be complex and every project is unique. The key factors that led to the contracting strategy on Brightwater included the size and complexity of the project, the tight schedule (which included lengthy siting, public involvement, and environmental review processes), the advantages and limitations of different delivery methods (including state and county procurement laws), and the different types of work involved. Based on these factors, the county selected to have separate contracts for the treatment plant, conveyance, and marine outfall during the predesign and design phases; one GC/CM contract for treatment plant construction; separate contracts for the conveyance tunnel construction, facilities, influent pump station; and a design-build contract for the marine outfall.
机译:大型资本项目的项目交付可能很复杂,并且每个项目都是唯一的。导致Brightwater签约战略的关键因素包括项目的规模和复杂性,时间紧迫(包括冗长的选址,公众参与和环境审查流程),不同交付方式(包括州和州)的优缺点。县采购法),以及涉及的不同类型的工作。基于这些因素,该县选择在预设计和设计阶段就污水处理厂,运输工具和海洋排污口签订单独的合同;一份有关污水处理厂建设的GC / CM合同;运输隧道的建设,设施,进水泵站的单独合同;以及海洋排污口的设计建造合同。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号