首页> 外文会议>Modelling and Simulation >COMPARISON OF MANUFACTURING SYSTEM CONFIGURATIONS USING SIMULATION CYCLE TIME AND THROUGHPUT PLOTS
【24h】

COMPARISON OF MANUFACTURING SYSTEM CONFIGURATIONS USING SIMULATION CYCLE TIME AND THROUGHPUT PLOTS

机译:利用仿真周期和通量图对制造系统结构进行比较

获取原文

摘要

Given the requirements and the design space, multiple alternative system configurations may be generated that have to be evaluated to select the best. Simulation based performance analysis is an indispensable method to accomplish such tasks particularly to complex systems as manufacturing systems which may not be analyzed appropriately by other methods. For systems with significant variability within or operating in a variable condition, then- performance is non-linearly and adversely affected. Performance plots such as cycle time and throughput plots are convenient way of capturing and summarizing the system dynamic performance and hence is a suitable way to systematically compare. In this paper, a simulation-based experiment is presented to compare systems with variability using their steady state cycle time and throughput.
机译:给定要求和设计空间,可能会生成多个替代系统配置,必须对其进行评估以选择最佳系统。基于仿真的性能分析是完成此类任务的必不可少的方法,特别是对于复杂的系统(如制造系统)而言,可能无法通过其他方法进行适当的分析。对于在可变条件内或在可变条件下具有明显可变性的系统,性能将受到非线性影响。性能图(例如周期时间和吞吐量图)是捕获和汇总系统动态性能的便捷方法,因此是系统比较的一种合适方法。在本文中,提出了一个基于仿真的实验,以比较系统具有稳态周期时间和吞吐量的可变性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号