DEVICES FOR CF SHEET POST-TENSION STRENGTHENING FOR STEEL BRIDGE GIRDER

机译:钢桥梁CF板后张加固装置

获取原文

摘要

In Japan, 20 tons track load had been adopted for bridge design codes since 1956, and it was upgraded to 25 tons in 1993. Although newly constructed bridges have been designed based on this code, most of the old bridges are still remaining under poor load capacity and are supporting heavy traffic until they would be strengthened. As well known, post-tension strengthening method has mainly been used for concrete bridges. However, this method becomes useful to strengthen existing steel bridges because additional load can be applied to meet the upgraded codes. In the present study, carbon fiber reinforced composites (CFRP) was tried as post-tension strengthening materials. The post-tension load was introduced into bridge girders by newly developed devices to pull and install carbon fiber sheet on the bottom of bridge girders. Then epoxy resin was impregnated into carbon fiber sheet. Finite element analysis has also been carried out to find out the design policy of this post-tension strengthening. With increasing the post-tension load, onset of delamination was expected. The analysis was mainly focused on how to prevent possible delamination at the end of CFRP. One of the smart and cheap way to avoid onset of delamination between CFRP and girder bridge is to suppress opening defection at the end of bonded CFRP by attaching the holding plates. The experimental results are also be presented. It is important to develop devices to introduce post-tension load in the bridge girder. Newly developed devices are also shown in this report.
机译:在日本,自1956年以来,桥梁设计规范就采用了20吨的轨道荷载,1993年将其提高到25吨。尽管根据该规范设计了新建的桥梁,但大多数旧桥仍处于不良荷载下能力,并支持繁忙的交通,直到它们得到加强为止。众所周知,后张力加固方法主要用于混凝土桥梁。但是,这种方法对于加强现有的钢桥很有用,因为可以施加额外的载荷来满足升级后的规范。在本研究中,尝试使用碳纤维增强复合材料(CFRP)作为后张力增强材料。后张力负荷通过新开发的装置引入到桥梁大梁中,以将碳纤维板拉动并安装在桥梁大梁的底部。然后将环氧树脂浸渍到碳纤维片中。还进行了有限元分析,以找出这种后张加固的设计策略。随着后张负荷的增加,预计会发生分层。分析主要集中在如何防止CFRP结束时可能的分层上。避免在CFRP和大梁桥之间发生分层的一种聪明而便宜的方法之一是通过固定板来抑制CFRP粘结端部的开孔缺陷。还介绍了实验结果。开发在桥梁中引入后张载荷的装置很重要。此报告中还显示了新开发的设备。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号