首页> 外文会议>Construction research congress >A Case Study for Improving BIM-FM Handover for a Large Educational Institution
【24h】

A Case Study for Improving BIM-FM Handover for a Large Educational Institution

机译:改善大型教育机构BIM-FM切换的案例研究

获取原文

摘要

Transferring life-cycle information to facility owners at project close-out for use in post-construction activities has become increasingly critical and needed to allow them to better manage and effectively maintain their facilities. This case study investigates the specific challenges that a large educational institution in the United States is having in terms of determining facility information for use during facility operations and management. The current process is tedious, time consuming, and error-prone, leading to information that is often inconsistent or incomplete. Process improvements utilizing industry standards and BIM are being examined and evaluated to determine which may be the best options for the University with the end goal being developed BIM guidelines and a Facility Information Management Guide that best fits the University's needs. The paper summarizes BIM-FM requirements of other large owners and how some experienced contractors have helped to overcome common challenges. The specific challenges related to the University and potential methods for overcoming those challenges are also presented. Lastly, a strategy to pilot test the process improvements is discussed with future strategies for successful adoption.
机译:在项目结束在后施工活动中使用传送生命周期信息设施拥有者已变得越来越重要,让他们更好地管理和有效地维护他们的设施需要。本案例研究调查,在美国的大型教育机构在期间运营和管理,确定设施使用信息方面是具有特定的挑战。当前过程是乏味,费时的,并且容易出错,导致这往往是不一致或不完整的信息。利用行业标准和BIM流程的改进正在检查和评估,以确定这可能是与最终目标的大学研制的BIM指引最佳场所和设施信息管理指南最适合大学的需求。本文总结其他大型业主的BIM-FM需求以及如何一些有经验的承包商,终于克服面临的共同挑战。有关大学和克服这些挑战的潜在方法的具体挑战还提出。最后,战略试点测试过程改进与成功采用未来战略进行讨论。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号