首页> 外文会议>China-Japan symposium on science and technology of iron and steel >Technical Measures and Effect of Prolonging Campaign Life of BF4 Shougang
【24h】

Technical Measures and Effect of Prolonging Campaign Life of BF4 Shougang

机译:首钢BF4延长战役寿命的技术措施和效果

获取原文

摘要

BF4 of Shougang has been operated smoothly for 9 years since its third generation beginning in May 1992, with no inter relining and none stave broken. A series of BF body maintaining measures and campaign prolonging experience have been achieved through this year practice. The paper introduces some measures like cooling strength control, gas distribution adjustment, remained line thickness monitor, gunite line rebuild by remote control, and using Ti ore for hearth maintenance etc. It is predicted that the campaign life of BF4 can be up to 11~12 years, and its output per cubic meter in whole life will be 8350~9000 t.
机译:首钢高炉BF4自1992年5月开始生产第三代以来,已经平稳运行了9年,没有衬砌,也没有断壁。通过今年的实践,已经实现了一系列的高炉身体保持措施和延长运动时间的经验。介绍了冷却强度控制,气体分布调节,残留线厚度监测,远程控制喷砂线重建以及使用钛矿进行炉膛维护等措施。预计BF4的运动寿命可以达到11〜 12年后,其整个生命周期的每立方米产量将为8350〜9000 t。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号