首页> 外文会议>International conference on ground control in mining >The Use of Strata Management Techniques for the Optimisation of Secondary Support in Longwall Installation Roadways at United Colliery, NSW, Australia
【24h】

The Use of Strata Management Techniques for the Optimisation of Secondary Support in Longwall Installation Roadways at United Colliery, NSW, Australia

机译:利用地层管理技术在澳大利亚南威尔州联合煤矿的Longwall安装巷道优化中的优化

获取原文
获取外文期刊封面目录资料

摘要

The immediate roof lithology at United Colliery is extremely variable and provides a challenge for the design of secondary support. Support design in recent longwall installation roads at the mine has been carried out using strata management techniques. These techniques allow a robust yet economical secondary roof support design to be achieved. Analysis of roof lithology and roof displacement during first pass driveage are used as a basis for the optimisation of the secondary support design prior to roadway widening. This paper will demonstrate the application of practical strata management techniques in the optimisation of secondary roof support in six installation roadways at United Colliery. The experience gained from the installation roadways for LWs 1 to 5 will be briefy discussed. The experience from LW 6 will be discussed in greater detail. The paper will describe the strata management system that was used, including mapping, borescoping and extensometry, as well as the development and application of a Trigger Action Response Plan (TARP).
机译:United Colliery的直接屋顶岩性极为变量,为二次支持的设计提供了挑战。近期LongWall安装道路的支持设计已经使用Strata管理技术进行。这些技术允许实现坚固但经济的二级屋顶支撑设计。第一次通过驾驶期间屋顶岩性和屋顶位移的分析用作巷道扩大前二次支撑设计的基础。本文将展示实用地层管理技术在联合煤矿六种安装巷道中次屋顶支撑优化中的应用。将讨论从安装道路1到5的安装巷道中获得的经验将被讨论。 LW 6的经验将更详细地讨论。本文将描述使用的地层管理系统,包括映射,骚动和扩展测量,以及触发动作响应计划(篷布)的开发和应用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号