首页> 外文会议>International bridge conference >Innovative Construction Means and Methods for the New Samuel De Champlain Bridge
【24h】

Innovative Construction Means and Methods for the New Samuel De Champlain Bridge

机译:新塞缪尔德尚普兰桥的创新施工手段和方法

获取原文

摘要

The construction of the New Champlain Bridge has significant challenges: 1. Construction schedule 2. Navigation restrictions: The Seaway traffic must be maintained during the construction. This paper discusses the following innovative methods: i) Delivery system for the segments to the tip of the deck. ii) An assembly system to adjust the lifted segment and the tip of the deck. These erection systems were developed to expedite construction and to keep maintenance of shipping.
机译:新尚普兰桥的建设具有重要挑战:1。施工时间表2.导航限制:在建设期间必须保持海路交通。本文讨论了以下创新方法:i)将段的分娩系统到甲板尖端。 ii)装配系统,用于调节提升的段和甲板的尖端。这些勃起系统开发为加快施工并保持运费。