At 2:57 PM on July 3,1998, CPUs Rio Hondo substation received some light misty rainfall. Two separate sets of free-standing 345KV current transformers (CTs) flashed-over resulting in two CΦ?line-to-ground faults. There were approximately 29 seconds between the two CΦ?line-to-ground faults. This disturbance resulted in the opening of three 345KV transmission lines, two 345/138KV autotransformers, two generating units, and the loss of at least 352 MW of load across CPUs system in the Lower Rio Grande Valley. The intention of this paper is to share an understanding of the operations at the Rio Hondo 345kV Station and its impact on the Lower Rio Grande Valley Power System.
机译:1998年7月3日下午2:57,CPU Rio Hondo变电站收到了一些薄雾。两组独立的独立式345KV电流互感器(CT)闪动,导致两个CΦ?线对地故障。两次CΦ?线对地故障之间大约相隔29秒。这种干扰导致打开了三个345KV输电线路,两个345 / 138KV自耦变压器,两个发电机组,并降低了下里奥格兰德河谷CPU系统的负载至少352 MW。本文的目的是就里奥本多345kV站的运行及其对下里奥格兰德河谷电力系统的影响达成共识。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号