首页> 外文会议>International conference on structural mechanics in reactor technology;SMiRT-15 >Thermal Leading Phenomena and Monitoring for Material Fatigue in Nuclear Power Plants
【24h】

Thermal Leading Phenomena and Monitoring for Material Fatigue in Nuclear Power Plants

机译:核电厂的热导现象和材料疲劳监测

获取原文

摘要

Components of thermal power plants are loaded mainly by thermal constraints, temperature transients and internal pressure. The design procedure of the components included definition of hte anticipated pressure and temperature histories. These were intended to make enveloping allowance for the stress and fatigue implications of all transients potentially occurring in service. Experience shows, however, that actually the sequence and frequency of load transients vary to considerable amount. Code regulations, therefore, require relevant loading parameters to be monitored and compared to design margins.
机译:火力发电厂的组件主要受到热约束,温度瞬变和内部压力的负载。组件的设计程序包括预计压力和温度历史的定义。这些旨在为可能在使用中发生的所有瞬态的应力和疲劳影响提供余量。然而,经验表明,负载瞬变的顺序和频率实际上变化很大。因此,法规要求对相关的加载参数进行监控,并与设计余量进行比较。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号