首页> 外文会议>Annual offshore technology conference >Deepwater Installation of a large Capacity FPSO with Large Number of Risers in the marlim Field
【24h】

Deepwater Installation of a large Capacity FPSO with Large Number of Risers in the marlim Field

机译:在marlim油田深水处安装具有大量立管的大容量FPSO

获取原文

摘要

This paper describes the sitie installation of a turret moored Floating Production, Storage and Offloading System-FPSO-in 780 meters of water in Campos Basin, offshore Brzil. The FPSO, a 270,000 dwt converted tanker, is the first of a series of two ordered by Petrobras for development of the Marlim Field. An internal bow mounted Turret system, anchored to the seafloor by 8 chain-wire rope-chain combined mooring legs, is used to permanently moor the FPSO in the location while allowing the vessel to feely weathervane. Thirty-five flexible risers, laid in a free-hanging catenary configuration, provide the flow path between the FPSO and the various subsea equipment on the seafloor. This paper describes the installation equipment and procedures employed.
机译:本文介绍了在巴西离岸的坎波斯盆地(Campos Basin)780米深的水域中安装的转塔式浮式生产,储存和卸载系统-FPSO的情景布置。 FPSO是一艘270,000载重吨的改装油轮,是巴西国家石油公司为开发Marlim油田而订购的两艘船中的第一艘。内部船头安装的炮塔系统通过8条钢丝绳绳索链组合的系泊腿锚定在海底上,用于永久固定FPSO在该位置,同时使船舶感觉到风向标。三十五个挠性立管以悬垂的悬链线形式铺设,提供了FPSO与海底各种海底设备之间的流动路径。本文介绍了所使用的安装设备和过程。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号