CLOSING THE GAP THE OMV SCHEDULING SYSTEM

机译:关闭OMV排程系统

获取原文

摘要

To our understanding a good Scheduling-System should solve 3 basic problems:(1) To close the ' scheduling-gap' to the monthly LP,(2) so that at no time a tank has an overflow or an underflow and(3) so that the units are running as smooth as possible.The most Scheduling-Systems we know are more or less event driven simulation systems. A simulation algorithm starts at time zero and works forward on the time axis, each event produces decisions by given rules to find a feasible schedule.Our approach is completely different. The heart of our system is a 3-period full refinery LP-model with some extra features and extensions. The period lengths are 3 days, 4 days and a variable restperiod, e.g. to the end of the month. The week of the first two periods is the essential scheduling time span. This LP is embedded in a C-programme which(1) generates the necessary dynamic LP-structure,(2) communicates with the LP in a recurrent way and(3) produces state of the art graphical output on a surface where the schedule can be manipulated by the scheduler without affecting the overall LP-solution.Open inventories and qualities are transferred automatically from the refinery date base into the scheduling system and the schedules can be sent over the refinery network, stored or printed.
机译:据我们了解,一个好的计划系统应该解决3个基本问题: (1)为了缩小月度LP的“计划间隔”, (2)使油箱在任何时候都没有溢流或下溢,并且 (3)使机组运行尽可能平稳。 我们知道的大多数调度系统都是或多或少的事件驱动的仿真系统。一种模拟算法从零时开始,并在时间轴上向前发展,每个事件都根据给定的规则产生决策,以找到可行的时间表。 我们的方法是完全不同的。我们系统的核心是具有一些额外功能和扩展的3期间全炼厂LP模型。期间长度为3天,4天和可变的周期,例如到月底。前两个时段的星期是必不可少的计划时间跨度。该LP嵌入在一个C程序中 (1)生成必要的动态LP结构, (2)经常与LP通信,并且 (3)在一个可以在不影响整体LP解决方案的情况下由调度程序操纵调度程序的表面上生成最新的图形输出。 未清库存和质量自动从炼油厂的日期库传输到计划系统,并且可以通过炼油厂网络发送,存储或打印时间表。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号