首页> 外文会议>American Water Works Association annual conference >Meeting a mission to supply water to the desert by phasing facilities
【24h】

Meeting a mission to supply water to the desert by phasing facilities

机译:履行通过分阶段设施向沙漠供水的任务

获取原文

摘要

The Southern Nevada Water Authority has a mission to meet Southern nevada's Water needs with resourceful,reliable,and responsive solutions,with the rapid growth occurring in the Las Vegas Valley,responding to this challenge has been accomplished by developing a phased capital imporvements plan.the need for the imorvements was based on assessing the current supply,projecting future demands,and imporving system reliability.Methods for plannign facilities inlcuded hydraulic modeling,cash flow projections,using existing facilities to their fullest,and incremental phasing of new facilities.the result was a long term capital improvements plan for water facilities totaling
机译:内华达州南部水务局的使命是通过足智多谋,可靠且响应迅速的解决方案来满足内华达州的水需求,随着拉斯维加斯山谷的快速发展,通过制定分阶段的资本改善计划已完成了对这一挑战的应对。对改进的需求是基于评估当前供应,预测未来需求以及提高系统可靠性。计划性设施的方法包括水力建模,现金流量预测,充分利用现有设施以及逐步逐步增加新设施。供水设施的长期资本改善计划

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号