【24h】

Valve open start

机译:气门开启

获取原文
获取外文期刊封面目录资料

摘要

How would you like to get your steam unit on the line from dead cold in about one third of the normal firing time? Imagine the savigs in fuel and labor with a procedure that is safe for the unit. Jacksonville Electric Authority dramatically reduces the time and fuel required to start its steam generating units using the Valve Open Start procedure. JEA's large 518 MW unit requires only 8 hours to minimum stable load after dispatch notice with a Valve Open Start, whereas 12 hours are required with a conventional cold start. Dispatchers can now wait for 4 extra hours to assess weather and interchange market conditions. Each start saves about 5000 in fuel alone. Typical startup problems such as "rotor long" and transient vibration are also remarkably reduced.
机译:您想如何在大约正常燃烧时间的三分之一时间内使蒸汽装置从严寒中恢复生产?想象一下,用省力的程序省油又省力。杰克逊维尔电力局使用“阀门开启开始”程序大大减少了启动蒸汽发生装置所需的时间和燃料。 JEA的大型518 MW机组在发出阀门开启启动通知后,仅需8小时即可达到最小稳定负载,而传统的冷启动仅需要12小时。调度员现在可以再等待4个小时,以评估天气情况和换乘市场情况。每次启动仅节省燃料约5000。典型的启动问题,例如“转子过长”和瞬态振动,也大大减少了。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号