SEQUENTIAL EXCAVATION UNDER NORTHERN BOULEVARD AND TWO SUBWAY STRUCTURES

机译:北部大道和两个地铁结构下的连续开挖

获取原文

摘要

Northern Boulevard Crossing (NBX) is the keystone portion of the massive $8.4+ billion East Side Access (ESA) Program by the Metropolitan Transit Authority Capital Construction (MTACC) to bring Long Island Railroad trains into and out of New York City's Grand Central Terminal. NBX constitutes the link between the Queens Tunnels and Manhattan Tunnels portion of ESA. The crossing consists of 120 FT of 2,000 square FT cross sectional area tunnel through soft ground, constructed utilizing Sequential Excavation Method (SEM) under the protection of a structural frozen arch.NBX extends under an active five track wide subway box, a major six lane highway, as well as through the foundation piles of operating elevated subway line structure. All of the above presented a unique challenge to the owner and contractor. NBX is the first and only SEM tunnel project within the five Boroughs of New York and was constructed by a Joint Venture of Schiavone Construction Co., LLC and Kiewit Infrastructure Co. (SK) Construction on NBX started in February 2010 with the SEM excavation starting in April of 2012 following access chamber excavation, grouting and ground freeze. Excavation was completed in November 2012 and was followed by PVC waterproofing installation and final lining concrete. This paper describes lessons learned from the SEM excavation and support, description of the freeze operation is covered in separate papers.
机译:北方大道路口(NBX)是由大都会捷运局基建(MTACC)把长岛铁路列车进出纽约市中央车站的大规模的$ 8.4 +十亿东城接入(ESA)计划的重点部分。 NBX构成了Queens隧道与ESA的曼哈顿隧道部分之间的联系。交叉口由120英尺为120英尺的200英尺2,000平方英尺的横截面积隧道,通过软接地,利用顺序挖掘方法(SEM)在保护结构冷冻拱门下构造.NBX在一个主要的五个轨道宽地铁盒下,是一个主要的六道高速公路,以及通过经营升高的地铁线结构基础桩。所有上述所有对所有者和承包商呈现出独特的挑战。 NBX是纽约五个自治市镇中的第一个且唯一的SEM隧道项目,由Schiavone建筑有限公司,LLC和Kiepit基础设施有限公司(SK)建造的NBX建造,于2010年2月,SEM挖掘启动在2012年4月访问室内挖掘后,灌浆和地面冻结。挖掘成立于2012年11月,然后是PVC防水装置和最终衬砌混凝土。本文介绍了从SEM挖掘和支持中学到的经验教训,在单独的纸纸中覆盖了冻结操作的描述。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号