首页> 外文会议>Rapid excavation and tunneling conference >NORTH STRATHFIELD RAIL UNDERPASS SHALLOW COVER DRIVEN TUNNEL
【24h】

NORTH STRATHFIELD RAIL UNDERPASS SHALLOW COVER DRIVEN TUNNEL

机译:北斯特拉斯菲尔德轨道地下通道浅盖驱动隧道

获取原文

摘要

The North Strathfield Rail Under Pass project is designed to grade separate 1.5km long diesel hauled freight trains from the electrified suburban rail network north of Sydney. The freight line will pass under three heavily trafficked suburban railway lines and one line currently not in use. The client and their consultants original concept was for a cut and cover tunnel that would take between three and five years to constructed because of the limited number of track possessions available during any one year. This paper describes other options considered before adopting an alternative 170m long highly skewed and very shallow driven tunnel under the operating railway tracks which will reduce the construction time to less than 12 months by minimising the need for track possessions.
机译:在传递项目下的北斯特拉斯菲尔德铁路设计为悉尼北部电气郊区铁路网络分别的1.5公里龙柴油牵引货运火车。货运行将根据三大贩运的郊区铁路线和目前不使用的一行。客户及其顾问原始概念是为了削减和覆盖隧道,这将需要三到五年,因为在任何一年内都有有限的轨道财产。本文介绍了在运行铁路轨道下采用替代170米长的高度偏斜和非常浅的驱动隧道之前考虑的其他选择,通过最大限度地减少跟踪财产的需要将施工时间降低到不到12个月。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号