首页> 外文会议>Rapid excavation and tunneling conference >CONSTRUCTION OF THE CONCRETE SLAB TRACK AT THE GOTTHARD BASE TUNNEL IN SWITZERLAND
【24h】

CONSTRUCTION OF THE CONCRETE SLAB TRACK AT THE GOTTHARD BASE TUNNEL IN SWITZERLAND

机译:瑞士Gotthard基隧道的混凝土板轨道的建设

获取原文

摘要

The Gotthard Base Tunnel is the longest railway tunnel under construction in the world. Alpine together with Balfour Beatty Rail GmbH is currently installing the concrete slab track and the access tracks to the existing line. The presentation includes an overview of the progress of work and a summary of the contractual and technical design of the railway works. The presentation's focus is the installation process for the slab track, the associated development of special machines such as the concreting train, transportation shuttle, sleepers and rail mounting systems as well as the selection and testing of the concrete recipes used.
机译:Gotthard基隧道是世界上最长的铁路隧道。 Alpine与Balfour Beatty Rail GmbH一起安装混凝土板轨道和进入现有线路的通道轨道。该介绍包括概述工作进度和铁路合同和技术设计的摘要。演示专注是板式轨道的安装过程,特殊机器的相关开发,如混凝土火车,运输班车,睡眠和轨道安装系统以及所使用的混凝土配方的选择和测试。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号