MINED ROCK TUNNEL THROUGH DAM ABUTMENT AT WARM SPRINGS DAM, SONOMA COUNTY, CA

机译:挖掘岩石隧道通过水坝邻接在温暖的泉水,索诺玛县,加州

获取原文

摘要

HNTB-Gerwick JV was contracted by the United States Army Corps of Engineers (USACE) to perform 65% design for a tunnel alternative to replace an emergency water supply line (EWSL) at Warm Springs Dam, Sonoma County, CA. The tunnel alternative consists of a 72 inch diameter pipe in carrier tunnel, 4.0 m (13.0 ft) wide by 3.4 m (11.0 ft) high. The proposed tunnel consists of 610 m (2,000 ft) of mined tunnel and 107 m (350 ft) of cut and cover tunnel. The mined tunnel would be constructed through the left abutment of the dam in sandstone and shale under high head of water. Key design and constructability issues include seismic design considerations, mined tunneling in weak rocks, groundwater control and dam safety.
机译:HNTB-GERWICK JV由美国陆军工程师(USACE)签约,为隧道替代品进行65%的设计,以取代温泉水坝,索诺玛县,索诺玛县的紧急供水线(EWSL)。隧道替代方案包括在载体隧道中的72英寸直径,4.0米(13.0英尺)宽度为3.4米(11.0英尺)。拟议的隧道由610米(2,000英尺)的开采隧道组成,切割和覆盖隧道107米(350英尺)。挖掘的隧道将通过砂岩和页岩在水下的阳光下的左邻接构成。关键设计和结构性问题包括地震设计考虑因素,弱岩石,地下水控制和大坝安全的挖掘隧道。

著录项