首页> 外文会议>Rapid excavation and tunneling conference >COMPENSATION GROUTING AT FLORENCE HSR TUNNEL
【24h】

COMPENSATION GROUTING AT FLORENCE HSR TUNNEL

机译:佛罗伦萨HSR隧道的补偿灌浆

获取原文

摘要

Florence HSR tunnel underpasses the densely urbanized area of Florence in Italy. TBM/EPB excavation is executed in soft soil and, in particular next to the southern portal, under a shallow cover: 6m to 8m of sand and clay separate the tunnel from the foundations of 2 masonry buildings and a steel bridge. Compensation grouting resulted as the best approach to preserve structures serviceability. The paper describes compensation grouting activities performed, from design to execution. The monitoring and data processing system is also detailed. Together with appropriate real-time post-processing strategies, it allowed a punctual control and guidance of the grouting activities.
机译:佛罗伦萨HSR隧道在意大利的佛罗伦萨的浓密城市化的地区底层。 TBM / EPB挖掘是在软土中执行的,特别是南部门户旁边,在浅盖下:6米至800万块沙子,粘土与2个砖石建筑物的基础和钢桥分开隧道。补偿灌浆导致保存结构可用性的最佳方法。本文介绍了从设计执行的补偿灌浆活动。监控和数据处理系统也详细说明。与适当的实时后处理策略一起,它允许对灌浆活动进行准时控制和指导。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号