NEW CONTRACT FOR THE COMPLETION OF THE BRIGHTWATER BT-3 TUNNEL

机译:完成Brightwater BT-3隧道的新合同

获取原文

摘要

Tunneling had stopped on one of the four Brightwater tunnels. King County negotiated a new contract (cost-reimbursement plus fixed fee) with Jay Dee /Coluccio JV, the Contractor that was just completing the Brightwater West Tunnel. In order to meet schedule constraints, the contract was negotiated in just five weeks, demonstrating the effectiveness of a “partnering” approach to solve difficult tasks. During the time the negotiations were underway, the Contractor began work on preliminary tasks on the assumption that the negotiations would be successful. Following contract execution, the Contractor negotiated new subcontracts and supply agreements for the new work and also coordinated with affected subcontractors on the remaining West contract work, which had to be delayed until after the BT-3 tunnel was completed. Following contract execution in mid-April 2010, the contractor re-built the TBM to address the expected conditions on the BT-3 tunnel. Mining of the BT-3 tunnel commenced on schedule in late September 2010. This paper discusses the contract negotiation process, the key considerations for each party, and the challenges that were overcome in order to get the work underway in a timely manner.
机译:隧道已经停止了四个明亮的隧道之一。 King County与Jay Dee / Coluccio JV谈判了一份新的合同(成本偿还加固定费用),该合同刚刚完成Brightwater West Tounnel的承包商。为了满足计划限制,合同在短短五周内进行谈判,展示了“合作”方法解决困难任务的有效性。在进行谈判的时候,承包商在谈判将成功的情况下开始讨论初步任务。合同执行后,承包商谈判新工作的新分包和供应协议,并与受影响的分包商协调,剩余的西方合同工作,该工作必须延迟到BT-3隧道完成后。在2010年4月中旬的合同执行之后,承包商重新建立了TBM,以解决BT-3隧道上的预期条件。 BT-3隧道的挖掘在2010年9月下旬开始。本文讨论了合同谈判过程,每个方的关键考虑因素以及克服的挑战,以及时进入工作。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号