WIENERWALD TUNNEL-A CHALLENGING INFRASTRUCTURE PROJECT WITH TWO 11-KM-LONG TBM DRIVES

机译:Wienerwald Tunnel-A具有挑战性的基础设施项目,具有两个11公里长的TBM驱动器

获取原文

摘要

The Wienerwald Tunnel is part of the new railway route between Vienna and St. P?lten, currently Austria′s largest tunnel project. By 2012, this new rail link will reduce travel time between Vienna and St. P?lten from 40 to 25 minutes. The technical challenges of the project include conventional tunneling in large cross sections on a length of 2,35 km, as well as the use of two tunnel boring machines with a diameter of 10,68 m on a length of 10,7 km each. Challenging geological conditions call for experienced tunneling crews and immediate reaction to actual conditions. On site segment casting and hauling of large material quantities over major distances need sophisticated logistics.
机译:Wienerwald Tunnel是维也纳和圣P之间新铁路路线的一部分?LTEN,目前奥地利最大的隧道项目。到2012年,这个新的铁路链路将减少维也纳和圣地尔之间的旅行时间。从40到25分钟开始。该项目的技术挑战包括大横截面的常规隧道,长度为2,35公里,以及直径为10,7英尺的两条隧道镗床,每个隧道镗孔机在10,7公里的时间内使用10,7公里。挑战地质条件要求经验丰富的隧道船员和对实际情况的立即反应。在各地段铸造和拖运大量距离上的主要距离需要复杂的物流。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号