首页> 外文会议>2011 rapid excavation and tunneling conference >WIENERWALD TUNNEL-A CHALLENGING INFRASTRUCTURE PROJECT WITH TWO 11-KM-LONG TBM DRIVES
【24h】

WIENERWALD TUNNEL-A CHALLENGING INFRASTRUCTURE PROJECT WITH TWO 11-KM-LONG TBM DRIVES

机译:WIENERWALD隧道-具有两个11公里长TBM驱动器的具有挑战性的基础设施项目

获取原文
获取原文并翻译 | 示例

摘要

The Wienerwald Tunnel is part of the new railway route between Vienna and St.rnP?lten, currently Austria′s largest tunnel project. By 2012, this new rail link will reducerntravel time between Vienna and St. P?lten from 40 to 25 minutes. The technical challengesrnof the project include conventional tunneling in large cross sections on a lengthrnof 2,35 km, as well as the use of two tunnel boring machines with a diameter of 10,68 mrnon a length of 10,7 km each. Challenging geological conditions call for experienced tunnelingrncrews and immediate reaction to actual conditions. On site segment casting andrnhauling of large material quantities over major distances need sophisticated logistics.
机译:Wienerwald隧道是维也纳和目前奥地利最大的隧道项目St.rnPllten之间的新铁路路线的一部分。到2012年,这一新的铁路连接将使维也纳和圣普尔滕之间的旅行时间从40分钟缩短至25分钟。该项目的技术挑战包括:在长达2.35 km的大断面中进行常规隧道掘进,以及使用两台直径为10.68 mrnon的隧道掘进机,每个长度为10.7 km。富有挑战性的地质条件要求经验丰富的掘进机,并需要对实际情况做出立即反应。现场分段铸造和大距离远距离运输需要复杂的物流。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号