首页> 外文会议>Rapid excavation and tunneling conference >A REVIEW OF TUNNELING DIFFICULTIES IN CARBONATE SEDIMENTARY ROCKS
【24h】

A REVIEW OF TUNNELING DIFFICULTIES IN CARBONATE SEDIMENTARY ROCKS

机译:碳酸泥土沉积岩隧道困难综述

获取原文

摘要

Tunneling in carbonate sedimentary rocks such as limestones and dolomites can be difficult when solution channels or voids are anticipated. Addressing the risk aspects associated with these formations can be done effectively through the Geotechnical Baseline Report (GBR) by properly characterizing the ground and ensuring that the Owner's and the Contractor's interests are represented and protected. This paper presents a review of tunneling difficulties in these rocks and includes a review of site investigations, geologic characterization, and presentation in the GBR. Key construction issues are also discussed, including appropriate excavation technology, mechanisms of face support and groundwater control, and quantifying grout takes.
机译:当预期溶液通道或空隙时,碳酸盐沉积岩等碳酸盐沉积岩(如石灰石)沉积岩石中可能是困难的。通过正确表征地面并确保主人和承包商的利益来解决与岩土基线报告(GBR)有效地通过岩土基线报告(GBR)来实现与这些地层相关的风险方面。本文介绍了这些岩石中的隧道困难,包括对网站调查,地质表征和GBR介绍的审查。还讨论了主要施工问题,包括适当的挖掘技术,面部支撑机制和地下水控制,以及量化灌浆。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号