Continuous review of the WNP-2 ORAM modeling has resultedi n numerous revisions and modifications which help to substantially strengthen the program logic and application value. Comments and feedback from the Operations Department have provided a key element for the improvmeent. Both deterministic and probabilistic modeling have been modified based on the requirement of outage scenario characteristics and lesson learned from applications.
展开▼