The layout of discharge facilities in Three Gorges Project is restrained by the diversion and navigation during the construction as the Yangzi River is in a huge flood flow and an important navigation channel. Some advantages and disadvantages on the four schemes are analyzed in the paper. It seems to be a good scheme with a non-navigation in open channel and two and a half diversion.
展开▼