首页> 外文会议>International conference exhibition for the power generationg industries >Teamwork, Planning, Communication, Prove to be The Key Elements of an Aggressive Rotor Weld Repair
【24h】

Teamwork, Planning, Communication, Prove to be The Key Elements of an Aggressive Rotor Weld Repair

机译:团队合作,计划和沟通被证明是积极的转子焊缝修复的关键要素

获取原文

摘要

A 520 MW unit down because of a crack in the midspan of the HP/IP rotor, current electrical demands at system capacity, and little hope of returning the unit back to service for the start of the Olympic games four weeks away. That was the situation Georgia Power faced when the Hammond station unit #4 suffered a forced outage. That is until plant manager Perry Boren and plant turbine engineer Harry Briscoe talked with representatives from ABB.
机译:由于HP / IP转子中跨出现裂纹,系统容量方面当前的电力需求以及在四周后的奥运会开始时将其重新投入使用的希望很小,因此一台520兆瓦的设备停机了。这就是佐治亚电力公司在哈蒙德#4机组遭受强制停电时所面临的情况。直到工厂经理Perry Boren和工厂涡轮工程师Harry Briscoe与ABB的代表进行了交谈。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号