首页> 外文会议>Ozone world congress >MODELLING INDUSTRIAL WASTEWATERS OZONATION IN BUBBLE CONTACTORS: SCALE-UP FROM BENCH TO PILOT PLANT
【24h】

MODELLING INDUSTRIAL WASTEWATERS OZONATION IN BUBBLE CONTACTORS: SCALE-UP FROM BENCH TO PILOT PLANT

机译:对气泡接触器中工业废水的分区建模:从本草到试点工厂的规模扩大

获取原文

摘要

A kinetic model constituted by ozone mol balance equations both in the gas and in the water and a total mol balance equation has been applied to predict concentrations of dissolved ozone, C_(O3), ozone partial pressure at the reactor outlet, P_(O3o), and remaining chemical oxygen demand, COD, for the ozonation of two industrial wastewaters released from distillery and tomato processing plants.The results showed good agreement with the experimental ones when applied to contactors of same height/diameter ratio. Deviations were less than 5%, 10 % and 10 % for COD, C_(O3) and P_(O3o),respectively. Similar deviations were also found when the model was applied to the ozonation in a bubble column for reaction times higher than 15 minutes. For the short initial reaction period deviations were much higher possibly due to incorrected values of mass transfer and reaction rate coefficients, the latter especially in the ozonation of tomato wastewaters.In all cases, however, the model predicts very well the experimental oxidation and ozone efficiencies. For these cases deviations were lower than ± 3 %.
机译:由气体和水中的臭氧摩尔平衡方程和总摩尔平衡方程构成的动力学模型已用于预测溶解臭氧浓度C_(O3),反应堆出口处的臭氧分压P_(O3o) ,以及将来自酿酒厂和番茄加工厂的两种工业废水进行臭氧处理所需的化学需氧量COD。 当应用于相同高度/直径比的接触器时,结果与实验结果吻合良好。 COD,C_(O3)和P_(O3o)的偏差小于5%,10%和10%, 分别。当将模型应用于鼓泡塔中的臭氧氧化反应时间超过15分钟时,也发现了类似的偏差。对于较短的初始反应期,偏差可能要大得多,这可能是由于传质和反应速率系数的值不正确造成的,后者尤其是在番茄废水的臭氧化处理中。 但是,在所有情况下,该模型都能很好地预测实验的氧化效率和臭氧效率。对于这些情况,偏差小于±3%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号