首页> 外文会议>Middle East oil show conference >The planning of the drilling and the rig upgrading for the HPHT pre-khuff well
【24h】

The planning of the drilling and the rig upgrading for the HPHT pre-khuff well

机译:HPHT霍夫前井的钻探计划和钻机升级

获取原文

摘要

In 1992 DMA OPCO (Abu Dhabi Marine Operating Company) started the detailed planning of a deep HPHT vertical exploration well that was to be drilled offshore Abu Dhabi on behalf of ADNOC (Abu Dhabi National Oil Company). Relevant offset data was not available. The nature of the well dictated that an optimised casing design would be required, and that significant rig modifications would be needed to satisfy the requirements of the well. This paper outlines how those challenges were achieved.
机译:1992年,DMA OPCO(阿布扎比海洋经营公司)开始了深层HPHT垂直勘探井的详细计划,该井将代表ADNOC(阿布扎比国家石油公司)在阿布扎比近海钻探。相关偏移数据不可用。井的性质决定了需要优化的套管设计,并且需要对钻机进行重大改动以满足井的要求。本文概述了如何应对这些挑战。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号