首页> 外文会议>中国第一届国际疏浚技术发展会议及展览会 >Environmental Aspects of Dredging: Tools and techniques for optimal projects and Real project experiences
【24h】

Environmental Aspects of Dredging: Tools and techniques for optimal projects and Real project experiences

机译:挖泥的环境方面:最佳项目和实际项目经验的工具和技术

获取原文

摘要

For environmental dredging works various tools and techniques have been developed, mat are able to meet very strict project demands. In addition to that, several mitigating options are at hand, should dredge performance not meet the expectations. For justified application of the best-suited techniques and procedures, a proper understanding of the relation between environment and project execution is essentiaL During the works, this urges for a close and accurate moniloring of performances.However, real life projects regularly show that close control of very basic aspects of operations is much more effective and of greater environmental importance than application of a highly sophisticated techniques. Yet a thorough understanding of dredging principles and dredged material behaviour is essential for responsible and durable project management.This paper discusses bom the available techniques, as highlights a few recent project experiences. Many techniques perform best use in undisturbed riverine deposits, but most projects are located in urbanised or industrialised areas where numerous obstructions impose a special approach.
机译:对于环境疏works工程,已经开发了各种工具和技术,毡能够满足非常严格的项目要求。除此之外,如果疏performance性能不符合预期,那么手头有几个缓解措施。为了合理应用最适合的技术和程序,必须对环境与项目执行之间的关系有一个正确的了解,这在工作期间强烈要求对表演进行精确而精确的监控。 但是,现实生活中的项目通常表明,与应用高度复杂的技术相比,对操作的非常基本的方面进行严格控制要有效得多,并且对环境的重要性也更大。然而,对于负责任和持久的项目管理,对疏dr原理和疏material行为的透彻了解是必不可少的。 本文讨论了bom的可用技术,重点介绍了一些最近的项目经验。在未受干扰的河床沉积物中,许多技术的使用效果最佳,但大多数项目位于城市化或工业化地区,这些地区的障碍物众多,采用了特殊的处理方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号