首页> 外文会议>中国第一届国际疏浚技术发展会议及展览会 >The Construction Technology Used In the Dian Chi's Cao Hai Contaminated Sediment Dredging Disposal Project(Phase One)
【24h】

The Construction Technology Used In the Dian Chi's Cao Hai Contaminated Sediment Dredging Disposal Project(Phase One)

机译:滇池草海污染泥沙疏&处置工程(一期)施工技术

获取原文

摘要

the Dian Chi's Cao Hai Contaminated Sedunent Dredging & Disposal Project (Phase One) ,with the purpose of removing the Cao Hai's inside contaminating source, is the first ever one of our nation's large lake environmental dredging projects. The paper mainly states the construction technology (which has been used in dredgiag of contaminated sediment, cofferdam construction & anti-seep treatment, and disposal of contaminated sediment & excess water) and its effect.
机译:滇池的草海污染的疏ed与处置项目(第一阶段)旨在消除草海的内部污染源,这是我国有史以来第一个大型湖泊环境疏projects项目。本文主要阐述了施工技术(已用于疏dr受污染的沉积物,围堰的施工和防渗处理以及受污染的沉积物和过量水的处理)及其效果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号