首页> 美国政府科技报告 >New Bedford Harbor Superfund Project Acushnet River Estuary Engineering Feasibility Study of Dredging and Dredged Material Disposal Alternatives. Report 10. Evaluation of Dredging and Dredging Control Technologies
【24h】

New Bedford Harbor Superfund Project Acushnet River Estuary Engineering Feasibility Study of Dredging and Dredged Material Disposal Alternatives. Report 10. Evaluation of Dredging and Dredging Control Technologies

机译:新贝德福德港超级基金项目acushnet河口工程疏浚和疏浚物料处置替代方案的工程可行性研究。报告10.疏浚和疏浚控制技术的评估

获取原文

摘要

This report presents the results of an evaluation of dredging equipment and techniques for removal of highly contaminated sediments from the upper estuary of the Acushnet River, a portion of the New Bedford Harbor Superfund Project. Site conditions as related to dredge selection and operation, factors considered in selection of equipment, various dredge types considered for use, and operational procedures and controls for sediment resuspension during dredging are described. Each of the dredge types is ranked according to the following criteria: compatibility for full-scale cleanup, availability, safety, potential for sediment resuspension, maneuverability, cleanup precision, cost and production flexibility, required water depth for operation, ability to access the site, and compatibility with disposal options. (fr)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号