首页> 外文会议>International conference on coastal structures >Extension of the Eastern breakwater in Malaga
【24h】

Extension of the Eastern breakwater in Malaga

机译:在马拉加的东风延伸

获取原文

摘要

Dragados is participating in the construction of the 1200 m long eastern vertical breakwater for the Port of Malaga that will allow the future growth of this Spanish port. this job includes the following operations; dregining a trench down to a good foundation, dumping and filling the trench with 1.3 milion cu.m. of mixed material protected by armour stone, levelling the mixed fill material in order to provide a flat support for the caissons, building, transporting and placing 30 concrete caissons of unusual size (42.65m x 21.12m x 21.5m.) and construction of the superstructure, including an internal edge beam. The new breakwater will be linked to the existing one by building a rubble mound breakwater and a wharf area prepared for port activities.
机译:Dragados正在参与建造1200米长的东部垂直防波堤,为马拉加港,将允许这一西班牙港口的未来增长。这项工作包括以下操作;将一个沟槽散到良好的基础,倾倒和填充沟渠,用1.3 milion cu.m.由Armor Stone保护的混合材料,平均混合填充材料,以便为沉皿,建筑,运输和放置30个不寻常的尺寸混凝土沉箱(42.65mx 21.12mx 21.5m)和建造上层建筑,包括内边梁。通过建造瓦砾土墩防波堤和为港口活动准备的码头区域,新的防水将与现有的堤坝联系在一起。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号