首页> 外文会议>NAECON 1992;IEEE national aerospace and electronics conference >Connectivity biased channel construction and ordering forbuilding-block layout
【24h】

Connectivity biased channel construction and ordering forbuilding-block layout

机译:连接性有偏差的通道构建和构建块布局的排序

获取原文

摘要

A number of techniques are presented for the construction andordering of routing channels for building-block layout. Before therouting channels are defined, the placement is modified so that properrouting space is assigned between the circuit blocks. A channel graph isthen constructed on which the global routing will be performed. Afterthe global routing a feasible routing order is assigned to thechannels., In contrast to other approaches, the algorithms use both thegeometrical data (the placement) and the topological data (theconnectivity) to decide which channel structure should be chosen fromthe feasible set
机译:提出了许多用于施工的技术。 构建模块布局的布线通道排序。之前 定义了路由通道,修改了放置位置,以便正确 在电路块之间分配了布线空间。通道图是 然后构造全局路由。后 全局路由将可行的路由顺序分配给 与其他方法相比,该算法同时使用了 几何数据(位置)和拓扑数据( 连接性),以决定应从中选择哪种渠道结构 可行集

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号