Most manufacturing floor control installations perform substantial analysis in choosing appropriate job sequencing algorithms with the aid of simulations, but tend to neglect further analysis required to continuously measure the degree of compliance to job sequencing rules. With the advent of on-line, real-time capabilities, priorities of jobs can change throughout the working day and frustrate the efforts of a facility in striving to "do the right jobs"
Further, different levels of work-in process were found to be major factors affecting the ability to comply with sequenced worklists.
This paper describes the various measurement schemes considered, highlighting the advantages and pitfalls of each. It also illustrates an effective reporting technique which lets management evaluate how manufacturing and/or production control areas are influencing customer serviceability.
大多数制造车间控制装置都在通过仿真选择合适的作业排序算法时执行大量分析,但往往忽略了持续测量对作业排序规则的遵守程度所需的进一步分析。随着在线实时功能的出现,工作的优先级会在整个工作日内发生变化,并挫败了机构努力“做正确的工作”的努力 P>
此外,发现不同程度的工作流程是影响遵守顺序工作清单能力的主要因素。 P>
本文介绍了所考虑的各种测量方案,重点介绍了每种方案的优点和陷阱。它还说明了一种有效的报告技术,可让管理层评估制造和/或生产控制区域如何影响客户可服务性。 P>
机译:功能性图像处理技术在土壤箱测试设备中用于测量子午线轮胎的接触面积和接触压力的潜力
机译:西班牙社会保障中的劳动能力评估过程:职业,职业和工作经历评估
机译:四元离子信号处理技术,可从MoCap数据自动评估舞蹈表演
机译:使用图像处理技术研究摇头表测试中的3-D测量方法(第4次报告,合成测量性能评估)
机译:在美国部分土地制和非土地制大学接受过本科学位的职业农业教师的教学能力,工作表现和态度(计划评估,效率)。
机译:在第三机构中实施血管伤口的临床过程管理:绩效改进项目的影响评估
机译:一种测量设施处理适当工作的能力的性能评估技术
机译:工作绩效因果模型的评价:工作经验与一般心理能力与工作绩效的关系。