The design and construction of Highway 407 ETR - Express Toll Route in Toronto requiredrninnovative geotechnical management to fast track design and construction to meet the tightrnconstruction schedule. The Geotechnical Manager and Quality Control Manager had tornwork in an integrated manner to develop procedures as the design progressed so thatrnapprovals could be obtained on time.rnThe geotechnical management of the project included advance planning and identification ofrnproblems, value engineering, innovative applications and constructability reviews. Siternspecific solutions had to be found to meet limitations of time and budget.rnInnovative solutions for various elements of the project including materials, constructabilityrnand design from geotechnical perspective are described in this paper. Lack of adequaterngeotechnical information was compensated by close monitoring of the work duringrnconstruction. Cooperation between design, construction and QA/QC resulted in timelyrnsolutions to difficult situations.
机译:多伦多407 ETR高速公路收费公路的设计和施工需要创新的岩土管理,以快速跟踪设计和施工,以满足紧张的施工进度。随着设计的进行,岩土工程经理和质量控制经理以一种综合的方式来制定程序,以便及时获得批准。该工程的岩土工程管理包括问题的提前计划和识别,价值工程,创新应用和可施工性审查。必须找到特定地点的解决方案来满足时间和预算的限制。本文从土力工程的角度描述了该项目各个要素的创新解决方案,包括材料,可施工性和设计。缺乏足够的岩土技术信息可以通过对施工期间的工作进行密切监视来弥补。设计,施工和质量保证/质量控制之间的合作导致了对困难情况的及时解决。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号