首页> 外文会议> >Supply Chain Distribution Network--- Optimized Design Model and its Solution Based on Time Constraints
【24h】

Supply Chain Distribution Network--- Optimized Design Model and its Solution Based on Time Constraints

机译:供应链分销网络---基于时间约束的优化设计模型及其解决方案

获取原文
获取原文并翻译 | 示例

摘要

To strengthen management of supply chain and increase its efficiency, how to step up the research on supply chain distribution network system has become a major topic on logistics. As traditional logistics can no longer suit the requirements for great circulation due to a waste of resources, it is necessary for us to establish distribution systems with network structure, which are composed of some nodes and lines, whose activities serve as a foundation of supply chain distribution system activity. Whether network design is sound or not will play a decisive role in the rationalization of the whole distribution system and social benefits from circulation of materials. Meanwhile it is also an issue of business investment decision of strategic significance. This paper attempts to make an approach to network optimization of the distribution system with multi-source and multi-product. while in the place of demand only small distribution outlets are set up, each of which will no longer establish and manage its own warehouse. Instead u0002 more energy will be concentrated on trading of goods with only one DC attending to supply. After overall consideration of such factors as inventory costs and distribution time, a time-constrained location model for distribution system with multi-source and multi-product is developed with a nonlinear programming approach and an optimum solution to the model with different constraint conditions is found using LINGO software in Microsoft Office. In this way the problems of quantity, location, scale and quantity of distributed products in the distribution center with network structure are solved preliminarily, thereby increasing the efficiency of supply chain.
机译:为了加强供应链管理和提高效率,如何加强对供应链分销网络系统的研究已成为物流的重要课题。由于传统的物流由于资源的浪费而不再适合大流通的需求,因此我们有必要建立一个由网络结构组成的分销系统,该网络由一些节点和线路组成,其活动是供应链的基础。分配系统活动。网络设计的合理与否将对整个配送系统的合理化以及物料流通带来的社会效益起决定性的作用。同时,这也是具有战略意义的商业投资决策问题。本文试图为多源,多产品的配电系统网络优化提供一种途径。而在需要的地方仅建立了一些小分销点,每个分销点将不再建立和管理自己的仓库。取而代之的是,更多的精力将集中在仅一个DC参与供应的商品交易上。综合考虑库存成本和配送时间等因素,采用非线性规划方法建立了多源多产品配送系统的时间受限位置模型,并找到了约束条件不同的模型的最优解。在Microsoft Office中使用LINGO软件。这样就可以初步解决具有网络结构的配送中心中配送产品的数量,位置,规模和数量的问题,从而提高了供应链的效率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号