首页> 外文会议>International Conference on Advance Mechatronics, Intelligent Manufacture and Industrial Automation >Maintenance scheduling for Diesel Generator support system of Container Crane using system dynamic modeling
【24h】

Maintenance scheduling for Diesel Generator support system of Container Crane using system dynamic modeling

机译:用系统动态建模对集装箱起重机柴油发电机支架系统的维护调度

获取原文

摘要

The number of container ships arrived to the container terminals in Port of Tanjung Perak Surabaya increase continuously year by year. The supporting infrastructures, including CC (Container Crane), are required to serve the loading-unloading of containers. This final project attempted to answer these demands by planning the maintenance schedules for CC Diesel Generator fuel and lubricating systems. Maintenance scheduling is important because it will be adapted to the CC operational pattern so that the maintenance activities as much as possible not to disturb the loading-unloading schedule. System dynamics method is used for modeling the behavior of the system so that proper scheduling can be obtained through the mechanism of determining the minimum reliability index value and availability. In addition to the total cost of the operation, that consists of running, maintenance, and downtime costs, will also become a consideration in determining the maintenance schedule. From the modeling, maintenance scheduling for the component such as fuel pump is every 4578 hours (for CC 1 and 2) and 4296 hours (for CC 3), separator is every 1453 hours (for CC 1 and 2) and 1439 hours (for CC 3), PT Pump is every 10169 hours (for CC 1 and 2) and 7774 hours (for CC 3), injector is every 4065 hours (for CC 1 and 2) and 3887 hours (for CC 3), oil pump is every 13559 hours for (CC 1 and 2) and 19435 hours for (CC 3). Then, for the other components such as fuel filter, oil filter and bypass oil filter which includes non-repairable component, will be replaced by the new one in every 256 hours for CC 1, 256 hours for CC 2, and 256 hours for CC 3.
机译:集装箱船数量到达Tanjung Perak Surabaya港口的集装箱码头逐年增加。包括CC(集装箱起重机),包括CC(集装箱起重机)的支持基础设施,以满足装卸集装箱。该最终项目试图通过规划CC柴油发电机燃料和润滑系统的维护计划来回答这些要求。维护调度很重要,因为它将适应CC操作模式,以便尽可能地尽可能地扰乱加载卸载时间表。系统动力学方法用于建模系统的行为,以便通过确定最小可靠性指标值和可用性的机制来获得适当的调度。除了运行,维护和停机费用的总成本外,还将在确定维护计划方面成为考虑因素。从建模,诸如燃料泵等组件的维护调度每4578小时(CC 1和2)和4296小时(对于CC 3),分离器每1453小时(CC 1和2)和1439小时(用于CC 3),PT泵每10169小时(对于CC 1和2)和7774小时(CC 3),喷射器每4065小时(CC 1和2)和3887小时(CC 3),油泵是每13559小时(CC 1和2)和19435小时(CC 3)。然后,对于诸如燃料过滤器,油过滤器和包括不可修复的组分的旁路滤油器的其他组件,将在CC 1,256小时的每256小时内每256小时替换为CC 2,256小时代替CC 3.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号