首页> 外文OA文献 >Generator Maintenance Scheduling Models in Power Systems. Integrated Cost Models for Generator Maintenance Strategy under Market Environment.
【2h】

Generator Maintenance Scheduling Models in Power Systems. Integrated Cost Models for Generator Maintenance Strategy under Market Environment.

机译:电力系统中的发电机维护调度模型。市场环境下发电机维修策略的综合成本模型。

摘要

Change from a regulated to deregulated structure means that, the centralized maintenance system is not valid any more. In the surveyed published literature, there is not a single model which incorporates all maintenance cost components to analyze the effect of different maintenance strategies for generator companies (GENCOs). The work enclosed in this thesis demonstrates that there is a considerable requirement for accurately modelling cost components of the maintenance model, to be used in maintenance scheduling for deregulated power system, in order to attain a superior schedule with major financial and operational impact. udThis research investigates and models most cost factors that affect the maintenance activities of the deregulated GENCOs, and demonstrates the utilization of the developed cost models in maintenance scheduling. It also presents the data gathering process for the developed maintenance cost model. A generator maintenance scheduling model that considers direct and indirect maintenance costs, opportunity costs (i.e. loss of customer goodwill), effective maintenance strategies, failures, and interruptions is developed.udA Genetic Algorithm (GA) based approach is employed to achieve maintenance schedules to various generators maintenance scenarios. An Analytical Hierarchy Process (AHP) approach is proposed for modelling customer goodwill. The maintenance model was redeveloped under the Reliability Centred Maintenance (RCM) strategy to analyze the effect of a maintenance strategy on maintenance costs. Case studies are presented to demonstrate the utilisation of the developed models.The investigation shows that the market prices, opportunity costs and maintenance strategy have an effect on the final maintenance schedule. The research demonstrates that the cost components are critical factors to achieve an effective maintenance schedule, and they must be considered and carefully modelled in order to reflect more realistic situation for maintenance scheduling of generator units in deregulation environment.
机译:从受管制的结构转变为受管制的结构意味着集中维护系统不再有效。在接受调查的已发表文献中,没有一个模型可以结合所有维护成本成分来分析发电机公司(GENCO)不同维护策略的效果。本文所包含的工作表明,对维护模型的成本要素进行精确建模的需求很大,可用于解除管制的电力系统的维护计划中,从而获得具有重大财务和运营影响的高级计划。 ud这项研究调查和建模了影响解除管制的GENCO的维护活动的大多数成本因素,并证明了开发的成本模型在维护计划中的利用。它还介绍了开发的维护成本模型的数据收集过程。开发了一种发电机维护计划模型,该模型考虑了直接和间接维护成本,机会成本(即客户信誉损失),有效的维护策略,故障和中断。 udA基于遗传算法(GA)的方法用于获得维护计划以各种发电机维护方案。提出了一种层次分析法(AHP)方法来对客户信誉进行建模。在以可靠性为中心的维护(RCM)策略下重新开发了维护模型,以分析维护策略对维护成本的影响。通过案例研究证明了所开发模型的利用率。调查表明,市场价格,机会成本和维护策略对最终维护计划有影响。研究表明,成本要素是实现有效维护计划的关键因素,必须对其进行仔细考虑和建模,以反映出放松管制环境下发电机组维护计划的更为现实的情况。

著录项

  • 作者

    Al-Arfaj Khalid Abdulaziz;

  • 作者单位
  • 年度 2009
  • 总页数
  • 原文格式 PDF
  • 正文语种 en
  • 中图分类
  • 入库时间 2022-08-20 20:21:48

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号